What is the assembly process of the Warrior Hybrid?

The assembly involves 3 simple steps: (i) prepare the system (e.g. connect AC source or battery if needed) and the disposable unit (i.e. take it out of the sterile pouch); (ii) connect the disposable unit to your line and to the Warrior’s base unit; (iii) prime the disposable unit and turn the system on. Warming will commence immediately.